The Upper Deck is 38" high on the short corner

Preparation    Preparation    Preparation    Preparation

4" x 4" Pressure Treated Posts - 2" x 8" Pressure Treated Built-Up Beams

2" x 6" Pressure Treated Joists, on 16" Centers Typical

The Hot Tub was left as a Self-Supporting Structure, Floating in the New Deck

Preparation    Preparation    Preparation    Preparation

Simpson Joist Hangers and Hurricane Ties were used


The Lower deck is 11" High at the Low Corner

Preparation    Preparation    Preparation

There is 27" between the Upper and Lower Deck

Wrap-Around Steps will Traverse You Between Ground Level & Deck Levels - Stringers on 24" Centers