| |||||
The Decks are Taking Shape The Transition Between the Decks and Walkways Worked Out Great The Deck Worked Out Great for the Cover to be Transitioned While Using the Hot Tub Amazing Also that the Hot Tub Frame Which was Built in the Dark prior to Moving, is Still Level Fascia Boards Cover the Riser Verticals, While all Decking is 5/4" Pressure Treated Deck Boards There is Still Lots of Trim Work Left to be Done, Along with Handrails, Seats and Skirting This page was last modified on: 04/25/2002 |
|
All Sketches, Designs & Photos |